Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
06/03/2024 High Risk Food Retail Yes Yes

Equipment Temperatures


Description Temperature
Retail bunker 52
Walk in cooler 42
Prep room 51
Retail end cap 36
Retail produce cooler section 38

Food Temperatures


Description Temperature State Of Food
Cantaloupe Bowl 40
Mixed Melon Bowl 39
Cut Honeydew 46
Cut Pineapple 47

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
Melon Sink 60 Produce Max
3 compartment sink 300 Kayquat 2

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
14 Food contact surfaces; clean and sanitized in 0
14 0080-04-09-.04(6)(a) Food contact surfaces shall be visually clean. out Observed produce dicer stored as clean with visual build up on the cutting surfaces. Priority Foundation (PF) 0
33 Thermometers provided and accurate in 0
33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable out Observed the retail bunker and stand up cooler without accurate thermometers. Priority Foundation (PF) 0
44,45 Utensils and equipment in 0
44,45 44 Food and Non-food contact surfaces, cleanable, designed, constructed, and used in 0
44,45 0080-04-09-.04(1)(a) Food contact equipment surfaces shall be safe, durable, corrosion-resistant, nonabsorbent, smooth, and easily cleanable out Observed all of the cutting boards scored to the point of not being easily cleanable. Priority (P) 0
46 Non-food contact surfaces clean in 0
46 0080-04-09-.04(6)(a)1(iii) Non-food contact surfaces shall be kept free of an accumulation of dust, dirt, food residue, and other debris. out Observed the vent guards in the prep area with visible dust build up. Core (C) 0
Total Score Violation Score Inspection Score Inspection %
100 8 92 92
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 1 44 97
Priority (P) 49 1 48 97
Priority Foundation (PF) 39 2 37 94