| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
There were no paper towels or drying devices observed to be available at the hand sink in the backroom next to the 3 bay sink. |
|
Priority Foundation (PF) |
0 |
| 47,48,49 Plumbing |
in |
|
|
|
0 |
| 47,48,49 47 Hot and cold water available |
in |
|
|
|
0 |
| 47,48,49 0080-04-09-.05(1)(c) Hot and cold running water at sinks |
out |
Hot water was observed to be turned off at supply line at the hand sink in the backroom next to 3 bay sink due to it constantly running when turned on. Needs repair. |
|
Priority Foundation (PF) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 51 Garbage and refuse properly disposed; facilities maintained |
in |
|
|
|
0 |
| 51,52 0080-04-09-.05(5)(a) Waste containers durable & cleanable; inaccessible to pests; drain plugs as required; outside dumpster on cleanable surface; outside dumpster properly constructed. |
out |
There was no drain plug observed on the outside dumpster behind the store. |
|
Core (C) |
0 |