08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
No soap was available in the men's restroom. |
|
Priority Foundation (PF) |
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
No paper towels were available at the hand sink attached the beverage station. |
|
Priority Foundation (PF) |
0 |
08 0080-04-09-.06(3)(a)4 Handwashing aids and devices may not be provided for sinks not designated as hand sink; hand signs not provided |
out |
No hand washing sign was observed at the hand sink attached to the beverage station. |
|
Core (C) |
0 |
42,43 Single service & gloves |
in |
|
|
|
0 |
42,43 42 Single-service articles stored and used |
in |
|
|
|
0 |
42,43 0080-04-09-.04(9)(c)1 Single-service articles protected from contamination |
out |
Multiple boxes of single use cups were observed stored directly on the floor in the back storage area. |
|
Core (C) |
0 |
44,45 Utensils and equipment |
in |
|
|
|
0 |
44,45 45 Warewashing facilities installed, maintained, and used; test strips |
in |
|
|
|
0 |
44,45 0080-04-09-.04(5)(a)4 Warewashing equipment shall be cleaned before use, to prevent recontamination, and at least every 24 hours if used. |
out |
The 3 compartment sink was observed with excessive black build up and empty containers of soap and sanitizer in it. Needs to be cleaned before each use to prevent contamination. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Observed missing ceiling tiles in the ware washing room. |
|
Core (C) |
0 |
51,52 0080-04-09-.06(5)(n) Premises maintained free of unnecessary items and litter |
out |
Excessive clutter was observed in the ware washing room. Needs to be cleaned and organized. |
|
Core (C) |
0 |