Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
08/03/2023 Low Risk Food Retail No No

Equipment Temperatures


Description Temperature
Retail cooler with juice 41
Beer walk in cooler 41

Food Temperatures


Description Temperature State Of Food

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
08 Adequate handwashing sinks properly supplied and accessible in 0
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices out Observed paper towels in unisex restroom had run out Priority Foundation (PF) 4
35,36 Pests & contamination in 0
35,36 35 Insects, rodents, and animals not present in 0
35,36 0080-04-09-.06(5)(k) Controlling Pests including evidence of pests and eliminating their presence. out Observed apparent rodent excrement on floor outside of beer walk in cooler; back storage room with boxes of paper had a scattering of apparent roach castings. No live rodent or insect activity noted. Priority Foundation (PF) 4
50 Toilet facilities; constructed, supplied, cleaned in 0
50 0080-04-09-.06(2)(b)4 Toilet room shall have a self-closing tight fitting door out Observed door to unisex restroom was not self-closing. Core (C) 4
50 0080-04-09-.06(5)(h) Toilet room cleaning frequency out Observed hole in wall/floor behind toilet was stuffed with empty toilet paper tubes. Core (C) 1
51,52 Facilities in 0
51,52 52 Physical facilities installed, maintained, clean in 0
51,52 0080-04-09-.06(5)(b) Physical facilities shall be cleaned as often as necessary out Observed piles of empty boxes and plastic casings from prior beer deliveries on floor of walk in beer cooler. Core (C) 0
Total Score Violation Score Inspection Score Inspection %
100 12 88 88
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 3 42 93
Priority (P) 49 0 49 100
Priority Foundation (PF) 39 2 37 94