44,45 Utensils and equipment |
in |
|
|
|
0 |
44,45 44 Food and Non-food contact surfaces, cleanable, designed, constructed, and used |
in |
|
|
|
0 |
44,45 0080-04-09-.04(4)(b) Fixed equipment shall be spaced to allow cleaning, sealed to adjoining walls, spaced at least 6inches from the floor |
out |
3-bay sink needs to be properly caulked to wall. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Small holes in wall above 3-bay sink need to be filled in. |
|
Core (C) |
0 |