01 PIC present, Knowledgeable, Duties |
in |
|
|
|
0 |
01 0080-04-09-.02(1)(a) Designated person in charge present |
out |
No PIC on location only employees |
|
Priority Foundation (PF) |
0 |
08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.05(2)(b)2 Handwashing sink, hot water at least 100F; metered faucets run in 15seconds |
out |
Water at prep/kitchen hand sink will not reach 100 F |
|
Priority Foundation (PF) |
0 |
08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
No soap at prep/kitchen hand sink |
|
Priority Foundation (PF) |
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
No paper towels at prep/kitchen or rest room hand sink |
|
Priority Foundation (PF) |
1 |
14 Food contact surfaces; clean and sanitized |
in |
|
|
|
0 |
14 0080-04-09-.04(7)(c) Hot water and/or sufficient chemical sanitizer; default time of 30 seconds in contact with utensils; see manufacture's instructions |
out |
When speaking to owner on phone about how to set up 3 bay sinks not being set up correctly - Sanitizer not last process. |
|
Priority (P) |
0 |
42,43 Single service & gloves |
in |
|
|
|
0 |
42,43 42 Single-service articles stored and used |
in |
|
|
|
0 |
42,43 0080-04-09-.04(9)(c)1 Single-service articles protected from contamination |
out |
Coffee filters not covered or protected at coffee station. |
|
Core (C) |
0 |
44,45 Utensils and equipment |
in |
|
|
|
0 |
44,45 45 Warewashing facilities installed, maintained, and used; test strips |
in |
|
|
|
0 |
44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. |
out |
No test strips found to test sanitizer. |
|
Priority Foundation (PF) |
0 |
44,45 0080-04-09-.04(5)(a)4 Warewashing equipment shall be cleaned before use, to prevent recontamination, and at least every 24 hours if used. |
out |
3 bay sinks black build up inside sinks. |
|
Core (C) |
0 |
47,48,49 Plumbing |
in |
|
|
|
0 |
47,48,49 48 Plumbing installed; backflow devices |
in |
|
|
|
0 |
47,48,49 0080-04-09-.05(2)(c)3 At least one service sink or one curbed cleaning facility equipped with a floor drain shall be provided; Toilets shall not be used for the disposal of mop water and s... |
out |
Unable to use mop sink due to using as a storage for unused equipment. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 51 Garbage and refuse properly disposed; facilities maintained |
in |
|
|
|
0 |
51,52 0080-04-09-.05(5)(a) Waste containers durable & cleanable; inaccessible to pests; drain plugs as required; outside dumpster on cleanable surface; outside dumpster properly constructed. |
out |
Drain plug missing on dumpster. |
|
Core (C) |
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Wall under at floor area 3 bay sinks and behind mop sink damage missing wall board. |
|
Core (C) |
0 |
51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
The 3-compartment sink faucet was unable to shut off hot water went water line was turned on. |
|
Core (C) |
1 |
51,52 0080-04-09-.06(5)(n) Premises maintained free of unnecessary items and litter |
out |
tall grass/weeds against outside walls of facility. |
|
Core (C) |
0 |