Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
06/04/2024 Low Risk Food Retail Yes Yes

Equipment Temperatures


Description Temperature
cooler 37
cooler 38
cooler produce 36
freezer -7
freezer -4
freezer -2
storage cooler 38
storage freezer 8

Food Temperatures


Description Temperature State Of Food
milk 38
chef salad 40 defrost

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
47,48,49 Plumbing in 0
47,48,49 49 Sewage and waste water disposal in 0
47,48,49 0080-04-09-.05(4)(c) Sewage and waste water properly disposed through public sewer or approved septic system; including condensate drainage out toilet system stopped up and if flushed possibility will back up. One restroom is completely closed off due to backing up. Priority (P) 0
50 Toilet facilities; constructed, supplied, cleaned in 0
50 0080-04-09-.05(5)(a)7 A toilet room used by females shall be provided with a covered receptacle for sanitary napkins. out lidded trash cans must be provided for each unisex restroom Core (C) 0
50 0080-04-09-.06(4)(b) Toilet rooms shall be conveniently located and accessible out one restroom is closed off, they stated stopped up and backs up. If flushed possibility it will back up. Stated had it worked on once but it still stopped up. Firm must have a working restroom for the employees. When asked where they used the restroom, stated she goes somewhere else. Core (C) 0
51,52 Facilities in 0
51,52 52 Physical facilities installed, maintained, clean in 0
51,52 0080-04-09-.06(5)(n) Premises maintained free of unnecessary items and litter out trash outside around dumpster area Core (C) 0
Total Score Violation Score Inspection Score Inspection %
100 9 91 91
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 3 42 93
Priority (P) 49 1 48 97
Priority Foundation (PF) 39 0 39 100