08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
no soap in the unisex restroom. |
|
Priority Foundation (PF) |
3 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Several ceiling tiles missing throughout the firm. |
|
Core (C) |
1 |
51,52 0080-04-09-.06(5)(b) Physical facilities shall be cleaned as often as necessary |
out |
General cleaning, dust present on retail shelves, vents in the retail area need cleaning. |
|
Core (C) |
2 |
51,52 0080-04-09-.06(5)(n) Premises maintained free of unnecessary items and litter |
out |
Excessive unused equipment and clutter throughout the kitchen area and the back of the store. |
|
Core (C) |
3 |