51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Ceiling tile was observed missing near the restrooms. |
|
Core (C) |
0 |
51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
There was ice buildup present inside of the retail reach-in freezer (no contact with food). |
|
Core (C) |
1 |
51,52 0080-04-09-.06(5)(m) Maintenance tools such as brooms, mops, vacuum cleaners need to be properly stored; mops stored to air dry. |
out |
Mops in the back stock room/storage area were observed directly on the floor, not stored to air dry. |
|
Core (C) |
0 |