08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
soap needed for handwash sink for restroom |
|
Priority Foundation (PF) |
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
paper towels needed at hand sink for restroom |
|
Priority Foundation (PF) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
ceiling tiles missing in warewash area |
|
Core (C) |
1 |