44,45 Utensils and equipment |
in |
|
|
|
0 |
44,45 44 Food and Non-food contact surfaces, cleanable, designed, constructed, and used |
in |
|
|
|
0 |
44,45 0080-04-09-.04(2)(b)6 Nonfood-contact surfaces shall be designed and constructed to allow easy cleaning and to facilitate maintenance |
in |
wall damage, paint flaking far end of kitchen wall****wall has so much soil and grease, it is at the point that it is not cleanable |
|
Core (C) |
0 |
47,48,49 Plumbing |
in |
|
|
|
0 |
47,48,49 47 Hot and cold water available |
in |
|
|
|
0 |
47,48,49 0080-04-09-.05(1)(c) Hot and cold running water at sinks |
out |
hot water cu off at pizza prep area, closure issued to pizza area until it is repaired, she called in while I was there and suppose to be here within 30 minutes. I did tell them they could move their condiments back to the kitchen and hold Ianthe cooler and make back there where there is a a working handsink. |
|
Priority Foundation (PF) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 51 Garbage and refuse properly disposed; facilities maintained |
in |
|
|
|
0 |
51,52 0080-04-09-.05(5)(a) Waste containers durable & cleanable; inaccessible to pests; drain plugs as required; outside dumpster on cleanable surface; outside dumpster properly constructed. |
out |
Grease receptacle not on hard surface |
|
Core (C) |
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
wall damage, paint flaking far end of kitchen wall****wall has so much soil and grease, it is at the point that it is not cleanable |
|
Core (C) |
3 |