| 50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
| 50 0080-04-09-.06(5)(h) Toilet room cleaning frequency |
out |
The public restroom floor needs to be cleaned. |
|
Core (C) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
The retail floors are unclean (visible dirt). |
|
Core (C) |
0 |
| 51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
The toilet needs to be repaired in the employee's restroom (The PIC has put a work order in already). |
|
Core (C) |
1 |
| 51,52 0080-04-09-.06(5)(n) Premises maintained free of unnecessary items and litter |
out |
There is trash on the premises and around the dumpster area. There is extreme clutter in the back storage area. |
|
Core (C) |
1 |