| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
Kitchen- no paper towels at hand sink for kitchen/prep/warmer area. |
|
Priority Foundation (PF) |
1 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Several ceiling tiles damaged, water pooling on floor at back construction rest room area. Wall damage at construction area. |
|
Core (C) |
1 |
| 53 Ventilation, lighting, and designated areas used |
in |
|
|
|
0 |
| 53 0080-04-09-.06(2)(b)2 Ventilation/hood system/filtration installed not to cause contamination |
out |
Vents over fryers excessive buildup need cleaning. |
|
Core (C) |
0 |