33 Thermometers provided and accurate |
in |
|
|
|
0 |
33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable |
out |
No visible thermometers in back coolers |
|
Priority Foundation (PF) |
0 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.05(5)(a)7 A toilet room used by females shall be provided with a covered receptacle for sanitary napkins. |
out |
Unisex restrooms do not have covered receptacles for sanitary napkins. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 51 Garbage and refuse properly disposed; facilities maintained |
in |
|
|
|
0 |
51,52 0080-04-09-.05(5)(a) Waste containers durable & cleanable; inaccessible to pests; drain plugs as required; outside dumpster on cleanable surface; outside dumpster properly constructed. |
out |
Dumpster area not properly maintained; excessive trash and debris lying on ground. |
|
Core (C) |
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Employee restroom has water leak causing water to pool onto floor behind toilet. |
|
Core (C) |
0 |