| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.05(2)(b)2 Handwashing sink, hot water at least 100F; metered faucets run in 15seconds |
out |
let hot water run over 2 minutes never got hot |
|
Priority Foundation (PF) |
0 |
| 33 Thermometers provided and accurate |
in |
|
|
|
0 |
| 33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable |
out |
no thermometer in 3 door cooler |
|
Priority Foundation (PF) |
0 |
| 47,48,49 Plumbing |
in |
|
|
|
0 |
| 47,48,49 47 Hot and cold water available |
in |
|
|
|
0 |
| 47,48,49 0080-04-09-.05(1)(c) Hot and cold running water at sinks |
out |
no running water available at mop sink employee stated turn off due to frozen pipes |
|
Priority Foundation (PF) |
0 |
| 50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
| 50 0080-04-09-.05(5)(a)7 A toilet room used by females shall be provided with a covered receptacle for sanitary napkins. |
out |
no covered trash container for ladies personal items |
|
Core (C) |
0 |