08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.05(2)(b)2 Handwashing sink, hot water at least 100F; metered faucets run in 15seconds |
out |
Hot water is not working at restroom sink |
|
Priority Foundation (PF) |
0 |
33 Thermometers provided and accurate |
in |
|
|
|
0 |
33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable |
out |
Thermometers required in coolers |
|
Priority Foundation (PF) |
0 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.05(5)(a)7 A toilet room used by females shall be provided with a covered receptacle for sanitary napkins. |
out |
Covered receptacle required for feminine waste products in restroom |
|
Core (C) |
0 |