| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Ceiling tiles in meat department broken, directly above food preparation tables. |
|
Core (C) |
2 |
| 51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Water pooling outside of meat department on floor. Drain cover from last report has been replaced, however, it is still broken and the area around the drain cover is in disrepair and uncleanable. Produce walk-in cooler door hinge is broken, not allowing door to properly close. |
|
Core (C) |
4 |