| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
No soap and handwashing sink in warewashing area. |
|
Priority Foundation (PF) |
0 |
| 08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
Need drying devices at hand sink in prep area or ware washing area. |
|
Priority Foundation (PF) |
0 |
| 24,25 Chemical hazards |
in |
|
|
|
0 |
| 24,25 25 Chemicals identified, stored, and used |
in |
|
|
|
0 |
| 24,25 0080-04-09-.07(2)(d)1 Sanitizers level over manufacture's suggested use |
out |
Tested towel bucket at 500 PPM. PIC hadn't been specifically trained on how to make and test sanitizer. |
Went through with PIC how to make sanitizer and was corrected. |
Priority (P) |
0 |