| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
Automatic soap dispenser at hand wash sink located at 3 bay sink was not functioning properly at time of inspection. |
PIC installed batteries to correct the issue during inspection. |
Priority Foundation (PF) |
0 |
| 08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
Paper towel disperser was observed to be empty at hand washing station designated for the roller grill. |
PIC supplied towels during inspection. |
Priority Foundation (PF) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Water observed to be leaking onto the floor with a drain from under the wash bay of the 3 bay sink at time of inspection. |
PIC turned in a work order on sink during inspection. |
Core (C) |