| 33 Thermometers provided and accurate |
in |
|
|
|
0 |
| 33 0080-04-09-.04(5)(b)1 Good Repair and Calibration (Thermometers shall be accurate to plus or minus 2F) |
out |
PIC did not have knowledge of how to calibrate thermometer. |
|
Priority Foundation (PF) |
0 |
| 47,48,49 Plumbing |
in |
|
|
|
0 |
| 47,48,49 49 Sewage and waste water disposal |
in |
|
|
|
0 |
| 47,48,49 0080-04-09-.05(4)(c) Sewage and waste water properly disposed through public sewer or approved septic system; including condensate drainage |
out |
Liquid observed leaking directly onto the floor from drain pipe under sanitizer basin of three compartment sink when water is running. |
|
Priority (P) |
1 |