| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.05(2)(b)2 Handwashing sink, hot water at least 100F; metered faucets run in 15seconds |
out |
Customer rest room water not getting over 70 degrees. |
|
Priority Foundation (PF) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Storage area at fuse box area wall not enclosed at wall/floor area. |
|
Core (C) |
1 |