Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
04/26/2023 High Risk Food Retail Yes Yes
04/26/2023 High Risk Food Retail Yes Yes

Equipment Temperatures


Description Temperature
Cake Case (Bakery) 35
Patisserie Case (Bakery) 25
Fresh Pack Wall 29
Bread Cooler (Deli) 38
Sandwich Prep Cooler (Deli) 35
Charcuterie Cooler (Deli) 40
Charcuterie Case (Deli) 34
Pizza Dough Cooler 36
Deli WIC 38
Chef Case (Deli) 35
Produce WIC 38
Seafood Case 34
Meat Case 36
Merch Case 36
Cheese RIC 35

Food Temperatures


Description Temperature State Of Food
Ham slices (Pizza Prep) 39
Sonoma (Chef Case) 43
Blacken Chicken (Chef Case) 37
Pasta Bistro (Chef Case) 38
Pumpkin Curry Soup 185
Chicken Noodle Soup 179
Cucumber Slices (Cold Bar) 42
Fried Rice (Hot Bar) 137
Popcorn Chicken (Hot Bar) 133-135

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
Bakery 3-Comp Sink 300 Diversity
Produce 3-Comp Sink 300 Diversity
Meat 3-Comp Sink 250 Diversity
Seafood 3-Comp Sink 300 Diversity
Prep Foods Dishwasher h2o 160
Cheese 3-Comp Sink 200 Diversity

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
46 Non-food contact surfaces clean in 0
46 0080-04-09-.04(6)(a)1(iii) Non-food contact surfaces shall be kept free of an accumulation of dust, dirt, food residue, and other debris. out Observed build up around the Specialty cheese knife rack Core (C) 1
47,48,49 Plumbing in 0
47,48,49 48 Plumbing installed; backflow devices in 0
47,48,49 0080-04-09-.05(2)(c)4 Plumbing system installed to prevent backflow of contaminant into the water supply system (hose bibb or vacuum breaker) out Vacuum breaker for the mop sink was broken. Ticket was put in for this item. Priority (P) 0
Total Score Violation Score Inspection Score Inspection %
100 6 94 94
100 6 94 94
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 1 44 97
Priority (P) 49 1 48 97
Priority Foundation (PF) 39 0 39 100