| 33 Thermometers provided and accurate |
in |
|
|
|
0 |
| 33 0080-04-09-.04(5)(b)1 Good Repair and Calibration (Thermometers shall be accurate to plus or minus 2F) |
out |
Walk in cooler thermometer is not accurate when checked with infrared verification |
Have refrigeration verify thermometer of walk in cooler or replace with new one |
Priority Foundation (PF) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Ensure all ceiling tiles are in place prior to opening. |
|
Core (C) |
0 |