| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
No soap available in customer restroom at time of inspection. |
Soap was supplied in restroom during inspection. |
Priority Foundation (PF) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Wall near the buggy return and in back stockroom across from the receiving door observed with damaged sheetrock. |
|
Core (C) |
0 |