Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
09/05/2025 High Risk Food Retail Yes No

Equipment Temperatures


Description Temperature
Deli Display Case 36F
Back room reach-in Cooler 33F
Walk-in Cooler 35F

Food Temperatures


Description Temperature State Of Food

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
3-bay sink N/a Bleach N/a

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
08 Adequate handwashing sinks properly supplied and accessible in 0
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices out Handwashing sink in restroom not supplied with paper towels. PIC voluntarily refilled paper towels Priority Foundation (PF) 1
14 Food contact surfaces; clean and sanitized in 0
14 0080-04-09-.04(6)(a) Food contact surfaces shall be visually clean. out Observed white and brown organic matter on ice shield of ice maker in rear storage area. Priority Foundation (PF) 1
40,41 Utensils in 0
40,41 40 In use utensils properly stored in 0
40,41 0080-04-09-.03(3)(d)2 In use utensils for food preparation or dispensing shall be stored properly; handle above food, or in running water, and protected. out Observed ice scoop used for filling bags of ice stored above ware washing area uncovered and resting on top of ice bags and miscellaneous items such as rags and sink stoppers. Core (C) 0
44,45 Utensils and equipment in 0
44,45 45 Warewashing facilities installed, maintained, and used; test strips in 0
44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. out Inspector observed that no sanitizer test kits were present at firm, PIC stated they had run out. Priority Foundation (PF) 0
Total Score Violation Score Inspection Score Inspection %
100 12 88 88
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 1 44 97
Priority (P) 49 0 49 100
Priority Foundation (PF) 39 3 36 92