| 06,07 Hand Hygiene |
in |
|
|
|
0 |
| 06,07 6 Hands Clean and Properly washed |
in |
|
|
|
0 |
| 06,07 0080-04-09-.02(3)(c) Wash hands immediately before engaging in food preparation including working with exposed food, clean equipment and utensils, and unwrapped single-service articles; donni... |
out |
Observed employee in concession area handle money and not wash hands before donning gloves. |
PIC had employee remove gloves and wash hands before putting gloves on. |
Priority (P) |
1 |
| 13 Food separated and protected |
in |
|
|
|
0 |
| 13 0080-04-09-.03(3)(b)1(i)(I) Raw animal foods must be kept separate from ready to eat foods at all times |
out |
Observed raw bacon to be stored directly above cooked ham in retail reach in bunker and raw bacon stored directly above cooked canadian bacon in retail reach in cooler. |
|
Priority (P) |
0 |
| 14 Food contact surfaces; clean and sanitized |
in |
|
|
|
0 |
| 14 0080-04-09-.04(6)(a) Food contact surfaces shall be visually clean. |
out |
Observed dried red organic matter on inside of grinder stored clean in meat cut room.
Observed dried red and brown organic matter on top cabinet of band saw stored clean in meat cut room. |
|
Priority Foundation (PF) |
0 |
| 44,45 Utensils and equipment |
in |
|
|
|
0 |
| 44,45 45 Warewashing facilities installed, maintained, and used; test strips |
in |
|
|
|
0 |
| 44,45 0080-04-09-.04(5)(a)4 Warewashing equipment shall be cleaned before use, to prevent recontamination, and at least every 24 hours if used. |
out |
Observed brown greasy organic matter on inside basin of sanitizer with employee filling sanitizer basin. |
Employee drained sink, cleaned basin and refilled sanitizer. |
Core (C) |
0 |
| 46 Non-food contact surfaces clean |
in |
|
|
|
0 |
| 46 0080-04-09-.04(6)(a)1(iii) Non-food contact surfaces shall be kept free of an accumulation of dust, dirt, food residue, and other debris. |
out |
Observed dust build up on vent guards in produce walk in cooler. |
|
Core (C) |
0 |
| 47,48,49 Plumbing |
in |
|
|
|
0 |
| 47,48,49 49 Sewage and waste water disposal |
in |
|
|
|
0 |
| 47,48,49 0080-04-09-.05(4)(c) Sewage and waste water properly disposed through public sewer or approved septic system; including condensate drainage |
in |
|
PIC placed lock out tag on machine. |
Priority (P) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Observed small leak from dish machine in deli ware washing area. |
PIC placed lock out tag on machine until fixed. |
Core (C) |
0 |