| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
No hand towels were available in the employee restroom or public restroom at time of inspection. |
|
Priority Foundation (PF) |
0 |
| 33 Thermometers provided and accurate |
in |
|
|
|
0 |
| 33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable |
out |
No thermometer in egg cooler or back coolers in stock room. |
|
Priority Foundation (PF) |
0 |
| 50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
| 50 0080-04-09-.05(5)(a)7 A toilet room used by females shall be provided with a covered receptacle for sanitary napkins. |
out |
No covered trash can in either restroom at time of inspection. |
|
Core (C) |
0 |