| 08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
| 08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
Need hand drying device at hand sink in meat room. |
|
Priority Foundation (PF) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Damage ceiling tile in several places along with missing tiles |
Discussed progress of roof repair and replacement options of missing tiles. |
Core (C) |
0 |