| 33 Thermometers provided and accurate |
in |
|
|
|
0 |
| 33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable |
out |
Observed TCS milk case and egg cooler without proper temperature measuring devices during today's inspection. |
|
Priority Foundation (PF) |
0 |
| 47,48,49 Plumbing |
in |
|
|
|
0 |
| 47,48,49 48 Plumbing installed; backflow devices |
in |
|
|
|
0 |
| 47,48,49 0080-04-09-.05(2)(c)4 Plumbing system installed to prevent backflow of contaminant into the water supply system (hose bibb or vacuum breaker) |
out |
Observed mop sink clogged and hose sitting inside of clogged water, without hose bibb or back flow device attachment during today's inspection. PIC voluntarily unclogged drain and removed hose from inside of mop sink basin. |
|
Priority (P) |
0 |