Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
12/15/2025 High Risk Food Retail No Yes

Equipment Temperatures


Description Temperature
Grab and Go Cooler 38
Walk-in Cooler 38

Food Temperatures


Description Temperature State Of Food
Chile 135

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
Three Compartment Sink 200 quat tablets

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
08 Adequate handwashing sinks properly supplied and accessible in 0
08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap out No hand soap at hand sink at 3 bay sink area. Priority Foundation (PF) 0
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices out No paper towels at hand sink at 3 bay sink area. Priority Foundation (PF) 0
14 Food contact surfaces; clean and sanitized in 0
14 0080-04-09-.04(6)(b)2 Cooking, baking equipment, and microwaves cleaning frequency; at least every 24 hours out Inside retail microwave crusty buildup up on inside cavity. Unable to determine when it was cleaned last. Priority Foundation (PF) 0
14 0080-04-09-.04(7)(c) Hot water and/or sufficient chemical sanitizer; default time of 30 seconds in contact with utensils; see manufacture's instructions out When asking how they clean tongs for hot dog roller. No sanitizer being used only soap. Trained on wash rinse sanitize with quat tablets supplied and test strips. Priority (P) 0
44,45 Utensils and equipment in 0
44,45 45 Warewashing facilities installed, maintained, and used; test strips in 0
44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. out Test strips on site for Quat expired Sept. 2025. Order new test strips that are not expired. Priority Foundation (PF) 0
Total Score Violation Score Inspection Score Inspection %
100 10 90 90
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 0 45 100
Priority (P) 49 1 48 97
Priority Foundation (PF) 39 4 35 89