| 44,45 Utensils and equipment |
in |
|
|
|
0 |
| 44,45 45 Warewashing facilities installed, maintained, and used; test strips |
in |
|
|
|
0 |
| 44,45 0080-04-09-.04(5)(a)4 Warewashing equipment shall be cleaned before use, to prevent recontamination, and at least every 24 hours if used. |
out |
Observed black build in the basins of the 3-compartment sink. |
|
Core (C) |
0 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Observed two holes in the walls of the retail area. |
|
Core (C) |
0 |
| 51,52 0080-04-09-.06(5)(b) Physical facilities shall be cleaned as often as necessary |
out |
Observed build up of debris on the floors behind the retail reach in cooler. |
|
Core (C) |
0 |