Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
12/29/2025 Medium Risk Food Retail No No

Equipment Temperatures


Description Temperature
WIC 36
RIC sandwiches 38
Prep Cooler 36

Food Temperatures


Description Temperature State Of Food
Pizza Sausage 36
Sliced Mushrooms 36
Tuna Sandwich 37

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
3 comp sink 50 Sanitizer

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
08 Adequate handwashing sinks properly supplied and accessible in 0
08 0080-04-09-.05(2)(e)1 Handwash sink shall only be used for washing hands; accessible at all times out Observed handwashing sink next to 3 compartment sink blocked by ice machine Priority Foundation (PF) 0
21,22 Date & Time for food safety in 0
21,22 21 Date Marking and Disposition in 0
21,22 0080-04-09-.03(5)(a)8 Date Marking; Discard food after 7 days at 41F out Observed open containers of pizza toppings in botton of prep cooler with no date marking. Food items were discarded. Priority (P) 0
44,45 Utensils and equipment in 0
44,45 45 Warewashing facilities installed, maintained, and used; test strips in 0
44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. out Observed no sanitizer test kit to measure sanitizing solutions. Inspector gave firm some test strips until some could be ordered. Priority Foundation (PF) 0
47,48,49 Plumbing in 0
47,48,49 49 Sewage and waste water disposal in 0
47,48,49 0080-04-09-.05(4)(c) Sewage and waste water properly disposed through public sewer or approved septic system; including condensate drainage out Observed no mopsink available for disposing of mop water/waste water. Priority (P) 0
Total Score Violation Score Inspection Score Inspection %
100 15 85 85
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 0 45 100
Priority (P) 49 2 47 95
Priority Foundation (PF) 39 2 37 94