| 14 Food contact surfaces; clean and sanitized |
in |
|
|
|
0 |
| 14 0080-04-09-.04(6)(a) Food contact surfaces shall be visually clean. |
out |
Slush machine has old slush mix inside need cleaning. |
|
Priority Foundation (PF) |
1 |
| 14 0080-04-09-.04(7)(c) Hot water and/or sufficient chemical sanitizer; default time of 30 seconds in contact with utensils; see manufacture's instructions |
out |
No chlorine bleach on site. |
|
Priority (P) |
1 |
| 44,45 Utensils and equipment |
in |
|
|
|
0 |
| 44,45 45 Warewashing facilities installed, maintained, and used; test strips |
in |
|
|
|
0 |
| 44,45 0080-04-09-.04(3)(a)2 Warewashing sink must have 3 compartments and be adequately sized for equipment being washed |
out |
no stoppers for the 3 compartment sink . |
|
Priority Foundation (PF) |
0 |
| 44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. |
out |
|
|
Priority Foundation (PF) |
1 |
| 50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
| 50 0080-04-09-.06(2)(b)4 Toilet room shall have a self-closing tight fitting door |
out |
Men restroom door is not self closing. |
|
Core (C) |
3 |
| 51,52 Facilities |
in |
|
|
|
0 |
| 51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
| 51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Several missing ceiling tiles throughout the prep area and some retail area. |
|
Core (C) |
3 |
| 51,52 0080-04-09-.06(5)(n) Premises maintained free of unnecessary items and litter |
out |
Excessive clutter throughout the facility non-working equipment. 2 compartments sink in other prep room that is no being used.
|
|
Core (C) |
3 |