08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.05(2)(b)2 Handwashing sink, hot water at least 100F; metered faucets run in 15seconds |
out |
No hot water was available in the restroom. |
|
Priority Foundation (PF) |
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
No paper towels or drying device was available in the restroom |
|
Priority Foundation (PF) |
0 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.06(5)(h) Toilet room cleaning frequency |
out |
Basin of restroom sink and floor of restroom need cleaning. Build up observed on both surfaces. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Excessive ice build up observed inside the novelty freezer |
|
Core (C) |
2 |