33 Thermometers provided and accurate |
in |
|
|
|
0 |
33 0080-04-09-.04(5)(b)1 Good Repair and Calibration (Thermometers shall be accurate to plus or minus 2F) |
out |
Observed probe thermometers not being calibrated |
Discussed ice water calibration process with PIC and provide a calibration fact sheet |
Priority Foundation (PF) |
0 |
40,41 Utensils |
in |
|
|
|
0 |
40,41 41 Utensils, equipment, and linens; stored, dried, and handled |
in |
|
|
|
0 |
40,41 0080-04-09-.04(9)(a)1 Equipment and utensils are allowed to air-dry or used after adequate draining |
out |
Observed black plastic tubs being wet nested |
Tubs were separated to air dry during inspection |
Core (C) |
1 |