Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
08/03/2023 High Risk Food Retail Yes Yes

Equipment Temperatures


Description Temperature
Prep Cooler 38
Upright Kitchen Storage Cooler 34
Walk-In Freezer -6
Walk-In Cooler 36

Food Temperatures


Description Temperature State Of Food
Sausage Gravy 156
Chicken Breast 209
Sliced Bologna 39
Potato Salad 40
Sliced Tomatoes 36
Raw Ground Beef 34
Sliced Deli Ham 36
Eggs (Cooked for Immediate Service) 196

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
3 Bay Sink 200 Steramine 74
Automatic Dish Machine Keystone

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
14 Food contact surfaces; clean and sanitized in 0
14 0080-04-09-.04(7)(c) Hot water and/or sufficient chemical sanitizer; default time of 30 seconds in contact with utensils; see manufacture's instructions out Sanitizer at insufficient concentration to properly sanitize at automatic dish machine, sanitizer solution checked at 0 PPM chlorine at time of inspection. Sanitizer supply container is empty with no additional supply on hand, all washed items must manually sanitized until sanitizer can be replaced at automatic dish machine. Priority (P) 0
21,22 Date & Time for food safety in 0
21,22 21 Date Marking and Disposition in 0
21,22 0080-04-09-.03(5)(a)7 Date Marking; 6 days beyond the day of creation; exceptions are commercially made deli salads, hard cheeses, semi-soft cheeses, cultured dairy products, preserved fish, ... out Opened sliced bologna stored in prep cooler and upright kitchen cooler is date marked only with a preparation date of 06/01/2023. Establishment slices bologna and freezes upon opening of package which is then thawed for later use, no date marking is currently being provided upon thawing of product to identify the date of thawing or the use/discard date of product after thawing. Priority (P) 0
Total Score Violation Score Inspection Score Inspection %
100 8 92 92
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 0 45 100
Priority (P) 49 2 47 95
Priority Foundation (PF) 39 0 39 100