08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.06(3)(a)2 Handwashing sinks, properly supplied with soap |
out |
There was no soap at the restroom hand sink. |
|
Priority Foundation (PF) |
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
There were no towels or drying devices at the hand sink near the three-compartment sink. |
|
Priority Foundation (PF) |
0 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.06(2)(b)4 Toilet room shall have a self-closing tight fitting door |
out |
The restroom door needs to be repaired to be self-closing. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Ceiling tile in the back storage area near the walk-in cooler needs to be replaced. The ceiling tile near the three-compartment sink needs to be repaired. The floor near the three-compartment sink needs to be repaired. |
|
Core (C) |
1 |
51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
The walk-in cooler has a leak and still water was present (possible contamination if food or beverages are stored). |
|
Core (C) |
0 |