08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.05(2)(b)2 Handwashing sink, hot water at least 100F; metered faucets run in 15seconds |
out |
Water temperature at unisex restroom observed not to reach the required temperature of 100F with inspector probe thermometer. Water temperature observed to reach a maximum temperature of 80F with inspector probe thermometer after running for four minutes. |
|
Priority Foundation (PF) |
0 |
47,48,49 Plumbing |
in |
|
|
|
0 |
47,48,49 49 Sewage and waste water disposal |
in |
|
|
|
0 |
47,48,49 0080-04-09-.05(4)(c) Sewage and waste water properly disposed through public sewer or approved septic system; including condensate drainage |
out |
Mopsink observed not to drain when water is run into sink basin. Inspector waited five minutes and water level did not decrease at all. |
|
Priority (P) |
1 |