08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
**No paper towels were available at the restroom hand washing sink |
Employee stocked paper towels during inspection |
Priority Foundation (PF) |
0 |
47,48,49 Plumbing |
in |
|
|
|
0 |
47,48,49 49 Sewage and waste water disposal |
in |
|
|
|
0 |
47,48,49 0080-04-09-.05(4)(c) Sewage and waste water properly disposed through public sewer or approved septic system; including condensate drainage |
out |
**Waste water was observed to be leaking onto the floor while the restroom hand washing sink was running |
|
Priority (P) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(5)(b) Physical facilities shall be cleaned as often as necessary |
out |
**Observed build-up of dust on the fans inside of the retail beer cooler |
|
Core (C) |
0 |