Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
08/28/2023 Low Risk Food Retail Yes Yes

Equipment Temperatures


Description Temperature
Backstock freezer -14
milk cooler 34
retail cooler 32
retail freezer -7

Food Temperatures


Description Temperature State Of Food

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
35,36 Pests & contamination in 0
35,36 35 Insects, rodents, and animals not present in 0
35,36 0080-04-09-.06(2)(b)5 Outer Openings - Protected out Gap observed under back exit door and under both front entrance doors. Core (C) 1
47,48,49 Plumbing in 0
47,48,49 48 Plumbing installed; backflow devices in 0
47,48,49 0080-04-09-.05(2)(c)4 Plumbing system installed to prevent backflow of contaminant into the water supply system (hose bibb or vacuum breaker) out Open ended water hose observed to be attached to faucet at mop sink without vacuum breaker backflow prevention device at time of inspection. Priority (P) 1
51,52 Facilities in 0
51,52 51 Garbage and refuse properly disposed; facilities maintained in 0
51,52 0080-04-09-.05(5)(a) Waste containers durable & cleanable; inaccessible to pests; drain plugs as required; outside dumpster on cleanable surface; outside dumpster properly constructed. out Outside dumpster observed to be missing drain plug and have two broken lids at time of inspection. Core (C) 0
51,52 52 Physical facilities installed, maintained, clean in 0
51,52 0080-04-09-.06(5)(b) Physical facilities shall be cleaned as often as necessary out Mop sink observed to be full of damaged products and milk coolers observed to have dried spillage at time of inspection. Core (C) 0
Total Score Violation Score Inspection Score Inspection %
100 11 89 89
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 3 42 93
Priority (P) 49 1 48 97
Priority Foundation (PF) 39 0 39 100