44,45 Utensils and equipment |
in |
|
|
|
0 |
44,45 45 Warewashing facilities installed, maintained, and used; test strips |
in |
|
|
|
0 |
44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. |
out |
lacking test strips for Chlorine sanitizer |
|
Priority Foundation (PF) |
0 |
47,48,49 Plumbing |
in |
|
|
|
0 |
47,48,49 47 Hot and cold water available |
in |
|
|
|
0 |
47,48,49 0080-04-09-.05(1)(c) Hot and cold running water at sinks |
out |
the mop sink lacks hot running water (hand sink and dish sink had both hot and cold running water) |
|
Priority Foundation (PF) |
0 |
53 Ventilation, lighting, and designated areas used |
in |
|
|
|
0 |
53 0080-04-09-.06(3)(c) Light Intensity shall be sufficient for cleaning where food is prepared or stored. |
out |
light was insufficient in the new meat cutting area to properly clean |
|
Core (C) |
0 |