Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
10/04/2023 High Risk Food Retail No No

Equipment Temperatures


Description Temperature
deli case 39
ice cream case 7
condiment case 30
chest freezer -3,-2

Food Temperatures


Description Temperature State Of Food
liver cheese 41
bologna 38

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
3 compartment sink bleach 123

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
40,41 Utensils in 0
40,41 40 In use utensils properly stored in 0
40,41 0080-04-09-.03(3)(d)2 In use utensils for food preparation or dispensing shall be stored properly; handle above food, or in running water, and protected. out ice scoop not covered PIC place ice scoop in ice bag during inspection Core (C) 0
44,45 Utensils and equipment in 0
44,45 45 Warewashing facilities installed, maintained, and used; test strips in 0
44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. out test strips out of date 9/2023 Priority Foundation (PF) 0
50 Toilet facilities; constructed, supplied, cleaned in 0
50 0080-04-09-.05(5)(a)7 A toilet room used by females shall be provided with a covered receptacle for sanitary napkins. out no lid for trash can in unisex restrooms Core (C) 1
50 0080-04-09-.06(2)(b)4 Toilet room shall have a self-closing tight fitting door out no self closing door on unisex restroom Core (C) 1
51,52 Facilities in 0
51,52 52 Physical facilities installed, maintained, clean in 0
51,52 0080-04-09-.06(5)(m) Maintenance tools such as brooms, mops, vacuum cleaners need to be properly stored; mops stored to air dry. out mop on the floor instead of hanging to dry. Core (C) 0
Total Score Violation Score Inspection Score Inspection %
100 8 92 92
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 4 41 91
Priority (P) 49 0 49 100
Priority Foundation (PF) 39 1 38 97