01 PIC present, Knowledgeable, Duties |
in |
|
|
|
0 |
01 0080-04-09-.02(1)(b) Demonstration of knowledge |
out |
PIC was unable to demonstrate knowledge in key areas of food safety (hot/cold holding temperatures, sanitizer concentration requirements, what qualifies as a food contact sanitizer) |
|
Priority Foundation (PF) |
0 |
02,03 Employee Health |
in |
|
|
|
0 |
02,03 2 Employee Health Policy and Reporting |
in |
|
|
|
0 |
02,03 0080-04-09-.02(2)(a) Food employees are required to report to the person in charge information about their health and activities as they relate to diseases that are transmissible through food... |
out |
PIC was unable to demonstrate knowledge of all symptoms and illnesses that require exclusion from food preparation. |
|
Priority (P) |
0 |
19,20 safe temperature holding |
in |
|
|
|
0 |
19,20 20 Cold holding temperature |
in |
|
|
|
0 |
19,20 0080-04-09-.03(5)(a)6(i)(II) Cold holding at 41F or less for Time/temperature control for safety foods |
out |
Observed multiple packages of cheese, gallons of milk, raw bacon, and opened banana peppers (refrigerate after opening) held above 41 degrees F when temperature was taken with inspector's probe thermometer. |
PIC voluntarily discarded all cold held for safety foods that were above 41 degrees F. |
Priority (P) |
0 |
33 Thermometers provided and accurate |
in |
|
|
|
0 |
33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable |
out |
Observed no thermometers available in prep upright cooler, milk and cheese retail cooler, or in retail hot box. |
|
Priority Foundation (PF) |
0 |
44,45 Utensils and equipment |
in |
|
|
|
0 |
44,45 45 Warewashing facilities installed, maintained, and used; test strips |
in |
|
|
|
0 |
44,45 0080-04-09-.04(3)(b)4 Test Kits to measure concentration of sanitizing solutions. |
out |
Observed no test kits available in the firm for any type of food contact sanitizer. |
|
Priority Foundation (PF) |
1 |
47,48,49 Plumbing |
in |
|
|
|
0 |
47,48,49 49 Sewage and waste water disposal |
in |
|
|
|
0 |
47,48,49 0080-04-09-.05(4)(c) Sewage and waste water properly disposed through public sewer or approved septic system; including condensate drainage |
out |
Observed water overflowing from 3 compartment sink drain directly on to the floor at ware washing area. |
|
Priority (P) |
0 |