08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.05(2)(e)1 Handwash sink shall only be used for washing hands; accessible at all times |
out |
Bottle of Fabuloso cleaner observed stored in kitchen handwash sink. |
|
Priority Foundation (PF) |
0 |
14 Food contact surfaces; clean and sanitized |
in |
|
|
|
0 |
14 0080-04-09-.04(5)(a)16 Sanitizer concentration shall be accurately determined |
out |
Kitchen employee not using sanitizer to sanitize cleaned equipment. Does not know how to use test strips. |
|
Priority Foundation (PF) |
0 |
35,36 Pests & contamination |
in |
|
|
|
0 |
35,36 36 Contamination prevented during food preparation, storage or display |
in |
|
|
|
0 |
35,36 0080-04-09-.03(3)(e) Food shall be stored in a clean location, not exposed to contamination, at least 6 inches above the floor. Food shall not be stored in prohibited areas such as: locker/ch... |
out |
Multiple open food containers observed in kitchen walk-in freezer. |
|
Core (C) |
1 |
37 Personal Cleanliness |
in |
|
|
|
0 |
37 0080-04-09-.02(4)(c) Food employees shall wear hair restraints such as hats, hair coverings or nets, beard restraints, and clothing that covers body hair while working with exposed food. |
out |
Cook observed not wearing hair restraint while preparing foods. |
|
Core (C) |
0 |
44,45 Utensils and equipment |
in |
|
|
|
0 |
44,45 44 Food and Non-food contact surfaces, cleanable, designed, constructed, and used |
in |
|
|
|
0 |
44,45 0080-04-09-.04(2)(b)6 Nonfood-contact surfaces shall be designed and constructed to allow easy cleaning and to facilitate maintenance |
out |
Heavy black crust built up on undersides of kitchen pans and pots. |
|
Core (C) |
1 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.05(5)(a)7 A toilet room used by females shall be provided with a covered receptacle for sanitary napkins. |
out |
Women's rest room trash can for feminine napkins is overflowing and not covered. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(2)(a) Floors, walls and ceilings - Designed, constructed, and installed smooth and easily cleanable |
out |
Significant staining from prior roof leaks evident on kitchen and store ceiling tiles. |
|
Core (C) |
0 |