47,48,49 Plumbing |
in |
|
|
|
0 |
47,48,49 47 Hot and cold water available |
in |
|
|
|
0 |
47,48,49 0080-04-09-.05(1)(c) Hot and cold running water at sinks |
out |
Observed water turned off to hand sink outside bathroom. |
PIC turned water on to sink. |
Priority Foundation (PF) |
0 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.06(2)(b)4 Toilet room shall have a self-closing tight fitting door |
out |
Observed no self-closing door available for employee unisex bathroom. |
|
Core (C) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(5)(b) Physical facilities shall be cleaned as often as necessary |
out |
Observed numerous cigarette butts and dust throughout firm near exit door. |
|
Core (C) |
0 |