08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.05(2)(b)2 Handwashing sink, hot water at least 100F; metered faucets run in 15seconds |
out |
Observed no hot water in the restroom handsink. |
|
Priority Foundation (PF) |
0 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.06(2)(b)4 Toilet room shall have a self-closing tight fitting door |
out |
Observed door to restroom not self closing |
|
Core (C) |
2 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(5)(m) Maintenance tools such as brooms, mops, vacuum cleaners need to be properly stored; mops stored to air dry. |
out |
Observed mop stored in mop bucket of dirty water. Not hung to dry |
|
Core (C) |
0 |