08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
No paper towels at hand sink for kitchen/prep area. |
put paper towels at hand sink. |
Priority Foundation (PF) |
0 |
33 Thermometers provided and accurate |
in |
|
|
|
0 |
33 0080-04-09-.04(2)(d)9 Temperature Measuring Devices shall be located in hot and cold holding units; easily readable |
out |
Thermometers not in Temperature contolled equipment. |
put thermometers in temperature controlled equipment. |
Priority Foundation (PF) |
0 |
51,52 Facilities |
in |
|
|
|
0 |
51,52 52 Physical facilities installed, maintained, clean |
in |
|
|
|
0 |
51,52 0080-04-09-.06(5)(a) Maintained in good repair |
out |
Rest room- wall damage behind toilet and also toilet water line leaking, ceiling tiles damaged falling out at ice machine area. |
fix wall damage, water line leak and ceiling damage. |
Core (C) |
0 |