Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
04/11/2024 High Risk Food Retail Yes Yes

Equipment Temperatures


Description Temperature

Food Temperatures


Description Temperature State Of Food
Fritata 166/TILT

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
Sanitizer spray bottles x7 200 to 400 SaniSave

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
08 Adequate handwashing sinks properly supplied and accessible in 0
08 0080-04-09-.05(2)(c)1 Handwashing sinks are installed according to the capacity of preparation areas out Observed in the CDS 3-compartment sink room, the dedicated handwashing sink does not have splash guards. On the right hand side of the sink the clean wares shelving unit butts up to the sink. Clean equipment is stored next to the sink. On the left hand side of the sink, the 3-compartment sink drain board with clean wares/equipment are air drying. Priority Foundation (PF) 0
08 0080-04-09-.05(2)(d)1 Handwashing Sinks located in food preparation, food dispensing, warewashing, and toilet rooms in Observed in the CDS room with the 3-compartment sink, the handwashing sink does not have splash guards. On the right hand side of the sink, there is a shelving unit, butt up to the sink, with clean wares stored next to the sink. On the left hand side of the hand sink, the 3-compartment sink drain board where clean equipment is air drying. Priority Foundation (PF) 0
47,48,49 Plumbing in 0
47,48,49 48 Plumbing installed; backflow devices in 0
47,48,49 0080-04-09-.05(2)(b)3 Air gap sufficient between water supply outlet and flood rim level out Observed in the CDS room with 3-compartment sink, the waste water pipe is inside the floor drain a few inches without a sufficient air gap. An air gap creates a physical gap between the sink and the drain to avoid backflow of wastewater into the sink. Please repair. Priority (P) 0
Total Score Violation Score Inspection Score Inspection %
100 9 91 91
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 0 45 100
Priority (P) 49 1 48 97
Priority Foundation (PF) 39 1 38 97