Inspection

Food Safety Retail Inspection

Inspection details


Inspection Date Inspection Type In Person/Virtual Establishment Type Risk Type Permit posted Previous inspection available
03/06/2024 High Risk Food Retail Yes Yes

Equipment Temperatures


Description Temperature
Stainless Steel Storage Freezer -3
Walk-In Cooler 37
Walk-In Freezer -1
Pizza Warmer 143
Roller Grill 162
Retail Creamer Dispenser 29
Reach in freezer -13
Grab and Go Cooler 38

Food Temperatures


Description Temperature State Of Food
Milk 35
Creamer 28
Jalapeno Cheddar Sausage 163
Angus Beef Hot Dogs 161
Ham and Pepper Jack Sandwich 155

Warewashing Information


Machine Name ppm Sanitizer Name Sanitizer Type Temperature
Three- Compartment Sink Sanitizer Plus

Violations


Violation Status Observations Corrective Actions Violation Category Repeat
24,25 Chemical hazards in 0
24,25 25 Chemicals identified, stored, and used in 0
24,25 0080-04-09-.07(2)(a) Chemicals shall be stored separate from food, utensils, equipment, and single service items out Febreze spray was observed in the prep area on the table. The PIC removed the spray from the area. Priority Foundation (PF) 0
35,36 Pests & contamination in 0
35,36 36 Contamination prevented during food preparation, storage or display in 0
35,36 0080-04-09-.03(3)(c)2 Storage or display of packaged food in contact with water or ice out There was excessive ice buildup in the reach in freezer located in the back storage area (ice was falling on the product in the freezer and ice was forming on product in the freezer). PIC has put an order in to request repair. Core (C) 3
47,48,49 Plumbing in 0
47,48,49 47 Hot and cold water available in 0
47,48,49 0080-04-09-.05(1)(c) Hot and cold running water at sinks out There was no cold water at the hand sink located in the men's restroom. Priority Foundation (PF) 0
51,52 Facilities in 0
51,52 52 Physical facilities installed, maintained, clean in 0
51,52 0080-04-09-.06(5)(a) Maintained in good repair out The walk-in cooler cooling unit had ice buildup on the unit and pipes. PIC has put an order in to request repair. Core (C) 0
Total Score Violation Score Inspection Score Inspection %
100 16 84 84
Violation Category Total Count Violation Count Inspection Count Inspection %
69 0 69 100
Core (C) 45 2 43 95
Priority (P) 49 0 49 100
Priority Foundation (PF) 39 2 37 94