08 Adequate handwashing sinks properly supplied and accessible |
in |
|
|
|
0 |
08 0080-04-09-.06(3)(a)3 Handwashing sinks, properly supplied with drying devices |
out |
No hand towels were observed to be available in the men's rest room at time of inspection. |
|
Priority Foundation (PF) |
1 |
50 Toilet facilities; constructed, supplied, cleaned |
in |
|
|
|
0 |
50 0080-04-09-.06(5)(h) Toilet room cleaning frequency |
out |
The men's restroom observed to have soiled paper and clothes on the floor at time of inspection, in addition to the toilet being soiled, not properly cleaned and sanitized. |
|
Core (C) |
2 |